2847 Main St, East Point, GA 30344

Call Us (404) 762-1000

WHAT WE DO

MERCEDES-BENZ STADIUM (VAP)

Atlanta Falcons Football Club - Atlanta, GA

VAP Prime Subcontractor for HMRM JV team providing support services that includes field supervisory support and safety and project management. Key responsibilities consisting of the oversight and construction of approximately 60,000 SF of Executive office space to support the Falcons Team Administration including team owner Arthur Blank’s executive office. Other VAP responsibilities included supervision of parking deck expansion, project carpenters, laborers and insulation of significant concrete structural supports.

HISTORIC FIRE STATION NO. 7

City of Atlanta - Atlanta, GA

Bryson Constructors performed as the general contractor for the renovations of the historic 104 year old Fire Station #7 in the Historic West End Neighborhood of Atlanta, GA. Totaling 7,307 SF, this facility was renovated to preserve much of the original interior and exterior character.  The work included, but was not limited to, the total renovation to all MEP systems, living and operational training spaces for EMS, selective demolition, masonry reinforcement and restoration, existing mold removal, painting, roofing, carpentry, doors, windows, finishes HVAC, Electrical, Civil and related work.

BOGAN PARK COMMUNITY & AQUATIC CENTER

Gwinnett County Parks and Recreation - Buford, GA

The Bogan Park Community & Aquatic Center project located in Buford, GA consisted of a major renovation and addition. Major demolition and pool renovations, translucent roof and exterior wall replacement, bathroom upgrades, ADA compliance measures and MEP improvements and upgrades were included.

CV HOLD LONGTERM PARKING DECK (VAP)

Hartsfield-Jackson Atlanta International Airport - Atlanta, GA

Bryson Constructors performed civil and site utilities package for the Maynard Jackson International Terminal Long Term Parking deck. VAP responsibilities consisted of new construction of administrative offices for the parking operations group at Hartsfield-Jackson Atlanta International Airport. Additional management was required by our team for cut and fill operations of over 86,000 cubic yards of soil for the 5 level, 2,647 space parking deck.

TUCKER HIGH SCHOOL REPLACEMENT (VAP)

DeKalb County School District - Tucker, GA

VAP Prime Subcontractor for Lead Contractor, Turner Construction at DeKalb County School District’s Tucker High School for the replacement of the 265,000 SF high school including a three-story parking deck.

INDIAN CREEK RECREATIONAL LODGE

Georgia State University - Stone Mountain, GA

The Indian Creek Recreational Lodge was a new construction project built as the first LEED-certified building at Georgia State University. The 4,700 square foot Lodge houses a large multipurpose room, break-out meeting rooms, an open lobby reception area with a fireplace, a catering kitchen, and front and rear decks for outside eating.

NORTH DEICING (ACW PORTION) (VAP)

Hartsfield-Jackson Atlanta International Airport - Atlanta, GA

VAP Prime Subcontractor for the Lead Contractor, Archer-Western Construction. The North Deicing Facility project at Hartsfield-Jackson Atlanta International Airport included the new construction of an deicing building in addition to, aircraft apron and supporting facilities. to provide a minimum of five unobstructed narrow-body deicing positions on the north airfield and approximately 580,000 SF of new apron pavement, 100,000 SF of pavement repairs, and the new construction of the operations facility.

ATLANTA POLICE DEPARTMENT CRIME LAB

Atlanta Police Department - Atlanta, GA

Bryson Constructors performed as the Prime General Contractor for the construction of the City of Atlanta’s Police Crime Lab. The overall project consisted of the construction of office spaces, weapons and ammunition storage, bullet recovery water tank room, a shooting range, narcotics laboratory and other building components required for the operation of the crime lab.

MAYNARD JACKSON INTERNATIONAL TERMINAL 7A (VAP)

Hartsfield-Jackson Atlanta International Airport - Atlanta, GA

VAP key subcontractor for the Holder/Manhattan/Moody/Hunt Construction JV for the construction of a new International Terminal building for Hartsfield-Jackson Atlanta Airport. The Silver LEED certified facility included extensive sitework, grading, and construction of an underground connector to existing International Concourse E. Ten (10) new International gates, arrival and departure facilities, baggage handling and customs facilities was also integrated into the existing airport.

CONRAC HERTZ CAR RENTAL FACILITY

Hartsfield-Jackson Atlanta International Airport - Atlanta, GA

New construction of a HERTZ customer car rental service facility and quick turn-around area at Hartsfield-Jackson International Atlanta Airport. Construction includes site development, construction of customer service center, fueling stations, car wash and auto parking area for cars.

AUTOMATED GUIDE WAY TRANSIT SYSTEM (AGTS) EMERGENCY REPAIRS

Hartsfield-Jackson Atlanta International Airport - Atlanta, GA

Bryson Constructors was contracted to stabilize and repair structural deficiencies in the North and South Bryson Constructors was contracted to stabilize and repair structural deficiencies in the North and South Automated Guide Way Transit System (AGTS) tunnels, as well as installing stationing markers at Hartsfield-Jackson Atlanta International Airport.

BUGGYWORKS OFFICES & WORKSPACE

East Point, GA

Historic renovation of existing 85,000 SF structure which utilized vintage materials, detailing and construction techniques of the 1930’s. The scope included selective demolition, masonry reinforcement and restoration, painting, roofing, carpentry, doors, windows, finishes HVAC, Electrical, Civil and related work.

EAGLE POINT APARTMENTS (NIP)

College Park, GA

Bryson Constructors performed as the Prime Contractor for the cosmetic upgrade to the forty-five unit (45) residential apartment complex. All units were tenant occupied and varied from studios to 3 bedroom apartments. The work included roof, window and HVAC replacement, plumbing fixture upgrades, new lighting and light fixtures, painting, flooring and miscellaneous carpentry repairs.

KAISER-PERMANENTE GLENLAKE MEDICAL CENTER

Neurology Unit - Morrow, GA

Bryson Constructors was contracted to build-out the existing Kaiser Permanente’s Glenlake Medical Center to accommodate a new Neurology unit. Renovations of the Radiology Prep and Recovery areas, nurse stations and providers offices were also completed.

GARDEN COURT APARTMENTS

Noise Insulation Program-Hartsfield- Jackson Atlanta International Airport - College Park, GA

Bryson Constructors performed as the Prime Contractor for the complete renovation of eighty-five (85) tenant occupied apartment units and one (1) residential structure. Complete restoration to comply with Federal Noise Insulation Program standards. Renovation work included asbestos / lead abatement, door and window replacement, wall and ceiling repairs, electrical upgrades, plumbing, HVAC, painting, sound insulation, flooring, finish carpentry, gypsum board and framing.

GARDEN COURT APARTMENTS

Noise Insulation Program-Hartsfield- Jackson Atlanta International Airport - College Park, GA

Bryson Constructors performed as the Prime Contractor for the complete renovation of eighty-eight (88) tenant occupied apartment units. Complete restoration to comply with Federal Noise Insulation Program standards. Renovation work included asbestos / lead abatement, door and window replacement, wall and ceiling repairs, electrical upgrades, plumbing, HVAC, painting, sound insulation, flooring, finish carpentry, gypsum board and framing.

SMART LANES IMPLEMENTATION

Hartsfield-Jackson Atlanta International Airport - College Park, GA

Conversion of designated TSA security check-point lanes to new SMART lane technology.  The project included installation of SMART Lane equipment, commissioning, electrical infrastructure, communication infrastructure and certain architectural modifications to facilitate the additional footprint to support the new equipment.

KAISER PERMANENTE - SOUTHLAKE COMPREHENSIVE MEDICAL CENTER

Jonesboro, GA

Bryson Constructors was contracted to build-out the existing Kaiser Permanente’s Southlake Comprehensive Medical Center to accommodate a new pharmacy.

SOUTH RIVER TUNNEL PUMP STATION

City of Atlanta - Atlanta, GA

New construction of 4,500 SF central pumping station; including loading dock, maintenance and mechanical electrical equipment rooms.

KROGER FOOD STORE #431

The Kroger Company - Roswell, GA

New construction of 4,500 SF central pumping station; including loading dock, maintenance and mechanical electrical equipment rooms.

SECURITY CHECKPOINT (TSA EXPANSION

Hartsfield-Jackson Atlanta International Airport - Atlanta, GA

Emergency design / build / renovation / reconfiguration of occupied office areas and the installation of new security checkpoint gates for the Transportation Security Administration at Hartsfield-Jackson Atlanta International Airport. The work consisted of a “design as you build” approach (approx. 250,000sf) with targeted demolition, removal protection and security systems upgrades.

CLAYTON COUNTY WATER AUTHORITY HEADQUARTERS

Morrow, GA

Renovation to approx. 33,000 SF existing office space, construction of 2,000 SF new building addition and stand-alone 3-lane drive through. The building addition includes six (6) teller stations, ballistic glazing and an extensive pneumatic tube system. Construction of a new water feature, new parking lot and all associated site work and landscaping.

OAK HILL ADOLESCENT FAMILY CENTER

Government of Fulton County, GA - Atlanta, GA

The Hogan/Bryson-Schneider Wright design/build team provided extensive renovations and expansion to Fulton County’s state of the art Oak Hill Child and Adolescent Center including the physical infrastructure of five buildings, three cottages, an administrative building, utility building and commercial kitchen. A full sized gymnasium, tennis courts, swimming pool and athletic field ispositioned within 22 acres of land.

DELTA AIRLINES SKY CLUBS

Hartsfield-Jackson Atlanta International Airport - Atlanta, GA

Bryson Constructors performed the complete renovation of approximately 28,000 SF for multiple Delta Airline Sky Clubs on every Concourse at Hartsfield-Jackson Atlanta International Airport. Construction components consisted of targeted demolition, passenger elevator installation, acoustical ceilings, framing, carpet replacement, floor and wall tile installation and ADA compliancy for Delta Sky Club travelers.